Notebase icon

English | 简体中文

# Notebase **Project status, wiki pages and databases for your notes. Local and private.** Notebase shows every project's **principle, open tasks, finished work and verification limits** at a glance, and adds workspace-style pages, databases, templates, relations, quick find and CSV/Markdown import and export, all as plain Markdown in your own vault. ![Notebase overview (illustration)](docs/images/hero.png) Illustration. Real screenshots below. - **Opt-in:** only notes you mark with `kit: ` inside one workspace folder you choose (default `Notebase/`) are read or changed. - **People first:** next action, due date, owner, status, decisions, related notes and verification come first. Internal bookkeeping (AI, session, token or log properties) stays hidden unless you turn it on. - **Never invents data:** a missing owner, due date or verification shows as **Not set**. - **Your view, your way:** show or hide fields, reorder them, filter and sort. Choices are saved. ![Features](docs/images/features.png) ## Screenshots ![Hiding and reordering fields on the project status board (demo)](docs/images/demo.gif) | Status board | Customize | |---|---| | ![Status board](docs/images/status-board.png) | ![Customize](docs/images/customize.png) | | Wiki pages and page tree | Relations and rollup | |---|---| | ![Wiki](docs/images/wiki.png) | ![Relations](docs/images/relations-rollup.png) | | Database: table | Database: board | Database: gallery | |---|---|---| | ![Table](docs/images/database-table.png) | ![Board](docs/images/database-board.png) | ![Gallery](docs/images/database-gallery.png) | | Templates | Quick find | |---|---| | ![Templates](docs/images/templates.png) | ![Quick find](docs/images/quick-find.png) | | Import a Notion export | Export | |---|---| | ![Import](docs/images/import.png) | ![Export](docs/images/export.png) | ## Install - **Manual:** download `main.js`, `manifest.json` and `styles.css` from the [latest release](https://github.com/Hakubisual/notebase/releases/latest) into `/.obsidian/plugins/obtion/`, then enable **Notebase** under Settings → Community plugins. - **BRAT (beta):** add `Hakubisual/notebase` in the BRAT plugin. - **Community plugins:** [Notebase in the community directory](https://community.obsidian.md/plugins/obtion). The plugin id is `obtion` (the project's earlier name), so the plugin folder is `.obsidian/plugins/obtion/`. Code blocks written for 0.1.0 (`obtion-status`, `obtion-db`, `obtion-children`, `obtion-breadcrumb`, `obtion-rollup`) still render. If you used 0.1.0 without changing settings, your existing `Obtion/` workspace folder keeps being used. Requires Obsidian 1.7.2 or later. ## Quick start 1. Command palette → **Notebase: Insert sample projects** to explore with sample data (written to `Notebase/Samples/`), or **Notebase: Create project**. 2. Command palette → **Notebase: Open project status board** (or the dashboard ribbon icon). 3. Click **Customize** to choose fields, their order, which statuses to show and how to sort. ## How notes are structured An Notebase note is a normal Markdown note with frontmatter: ```yaml --- kit: project # project | task | decision | wiki | record status: active # project: active, paused, done, dropped owner: Alex # optional; empty stays "Not set" due: 2026-11-15 # optional --- ``` Tasks and decisions link to their project with `project: "[[Garden planner]]"`. A project note has four sections (headings can be renamed in settings): ```markdown ## Principle - How this project works. ## To do - [ ] Next action ## Done - What is finished, and where the evidence is ## Verification limits - What has not been verified yet, and why ``` ## Features ### Status board One card per project with status, progress (done vs. open items; a dashed bar when nothing is recorded) and the fields you choose. Embed the board in any note with an `notebase-status` code block. Commands: **Open project status board**, **Create project**, **Create task**, **Create decision** (pre-selects the current project), **Insert sample projects**. ### Wiki pages **Create wiki page** and **Create wiki subpage** (adds a `parent` link). The **Wiki pages** side view shows the page tree. Code blocks: `notebase-children` lists sub-pages (`depth: 2` for two levels); `notebase-breadcrumb` shows the path to the top page. ### Databases Add a code block to any note: ````markdown ```notebase-db kind: task # project | task | decision | wiki | record layout: board # table | board | gallery filter: - property: status op: in # equals | in | contains | empty value: [todo, doing] sort: - property: due direction: asc columns: [status, project, due, owner] ``` ```` Change status inline, edit text properties, create a new note with **New**, and save your field choices with **Customize**. **Open database view** opens the same database in its own tab. ### Templates and relations A templates folder inside the workspace folder (default `Templates`). **Install starter templates** adds a meeting note, weekly review, bug report and reading note. **New note from template** fills `{{title}}`, `{{date}}`, `{{time}}`, `{{project}}`, `{{parent}}` and `{{folder}}`. The **Relations** side view shows links in and out of the open note with a rollup (count by status, percent done); an `notebase-rollup` code block shows the same inside a note. ### Quick find **Find note** with filters `kind:task`, `status:doing`, `project:garden`, `is:open` and `"quoted phrases"`; Enter opens, Ctrl/Cmd+Enter opens in a new tab. Also **Go to project**, **Next open task**, **Find in project** and **Recent notes**. ### Import and export - **Import Notion export:** unzip a Notion "Markdown & CSV" export into your vault, pick the folder, preview with a dry run, then confirm. New notes go to `Notebase/Imports/ /`; the source files are never changed. - **Export notes:** writes a CSV (UTF-8 with BOM) and a Markdown table to `Notebase/Exports/`. The `templates/notion` folder contains a sample import pack (CSV and Markdown) for recreating the layout in a Notion workspace with Notion's own importer. ## Works better with an AI assistant Notebase keeps everything in plain Markdown with a small, strict frontmatter contract. Any assistant that can read and edit files in your vault (Codex, Claude, Cursor, Copilot, local models) can create projects, keep statuses current, write weekly summaries and suggest next actions, while the boards stay readable for people. - Give the assistant the rules in [`examples/ai/AGENTS.md`](examples/ai/AGENTS.md): copy it to your vault root (save a copy as `CLAUDE.md` for Claude Code), or use [`examples/ai/notebase.mdc`](examples/ai/notebase.mdc) as a Cursor rule. - Ready-made prompts: [`examples/ai/prompts.md`](examples/ai/prompts.md). Full guide: [`docs/AI-GUIDE.md`](docs/AI-GUIDE.md). The key rules: use the defined statuses; fill human fields (`owner`, `due`, `project`, `verified`) only with known values and leave the rest empty; never mark something done or verified without evidence the person can open; never overwrite, rename or delete notes; keep the assistant's own bookkeeping in internal fields (`session`, `model`, `tokens`, `log`), which Notebase hides by default; propose bulk changes before applying them. ## Privacy and safety - **No network access, no telemetry, no account, no ads.** - Reads and writes only inside your vault, and only inside the workspace folder. The whole vault, hidden folders and paths with `..` cannot be chosen. - New files get a free name ("Reading list 2") and **never overwrite** an existing file. - Frontmatter is edited only in notes that opted in with a known `kit` kind. Notes are never deleted or renamed. - Disabling or uninstalling leaves all notes untouched. Uninstalling also removes Notebase's saved view preferences. ## Limits See [`docs/FEATURE-MATRIX.md`](docs/FEATURE-MATRIX.md). Not included: real-time collaboration, comments, sharing, API sync, formulas, timeline/calendar views, ZIP import. Not yet tested on mobile devices or light themes. ## Development ```bash npm install npm run dev # watch build npm run typecheck && bun test && npm run build && npm run lint npm run package # validates manifest/versions and writes dist// release assets + zip ``` Architecture: [`docs/ARCHITECTURE.md`](docs/ARCHITECTURE.md). Releasing: [`docs/RELEASING.md`](docs/RELEASING.md). ## License [MIT](LICENSE)